风之空灵
技术笔记---记载学到技术的点点滴滴
9/14/2009
task 09/15/2009
Make a scatter plot of (r,t)
where r is the distance of the station and t is the time bin of the first peak/largest peak.
This is used to see if the station far away from the core(large r) has bigger time residual or not.
没有评论:
发表评论
较新的博文
较早的博文
主页
订阅:
博文评论 (Atom)
没有评论:
发表评论